Installation Instructions
Step 1: Install the pavers

Step 2: Slide the bottom section of Diamond-Lok up to the sidewall until the edging sidewall is flush with the pavers

Step 3: Install the stakes at each end and approximately every 2 feet by pounding them through the holes provided on an angle facing the pavers
NOTE: Anchor stakes need to be hammered in at the angle shown in the picture with the head of the anchor stake pointing up.

Step 4: Backfill with soil and sod flush against edging sidewall

2023 Catalog and Price List
Propane Gas Refill Service
Make Tamelings your stop for propane gas refill. We service gas grill bottles, lift trucks, campers, and motor homes.
Employment
We at Tameling Industries are always looking for good people to help us with the following day to day operations:
- Sales Counter: The job would require dealing with both landscapers and homeowners that come into our showroom. Taking delivery orders over the phone and working a basic cash register. We are open during the summer months six days a week and could be looking for full time or part time people.
- Yard Help: The job would require driving tractors and forklifts loading up landscapers as well as Tameling delivery trucks.
- CDL Driver: We require a CDL class B with air brake endorsement and CDL class A.